The Engineer from the Comak Group received dam drawings and other pertinent data from LAMSBD for the Flood Inundation Study.
Southeastern Surveying will begin tomorrow on Lake Asbury. Later it will move on to Lake Ryan and South Lake Asbury. Their 15 foot white boat will be used on Lake Asbury and South Lake Asbury except on Lake Ryan they will use a small orange non motorized boat. The surveying will take place over a couple of weeks depending on the weather. They will not survey on the weekends.
We will keep you informed of the progress.