LAMSBD had divers come this morning (July 5, 2021) and remove the plugs from the end of both pipes on the North lake. (Lake Asbury). After this was completed the west valve was opened to control water levels. A siphon system is being installed tomorrow to assist with controlling water levels. After the storm passes we have plans to still repair the East valve on Lake Asbury and the valve on Lake Ryan.