Time – 3:55 PM
LAMSBD signed a proposal with Thompson Contracting Group for the repairs to the Spillway on South Lake Asbury.
They will begin work on June 19, 2023. While the job timing cannot be firm, it is estimated to be 9 weeks.
Hanson Professional Services will have a Geotechnical Engineer follow the project as needed.
Tarps were installed over the damaged areas.
The South Lake is 12″ lower than the normal water level and no boating is allowed until further notice.
LAMSBD